External systems used
This webapp uses the following external systems to allow analysis of the train path.
| System | Wherefore? |
|---|---|
| Infranet | Base topology of the railway network (trails and nodes). Used to visualize the train path and to find the common path. |
| EBP log | The basis of the train path is a list switch registrations made in the EBP system. |
| SAMx | The data platform on which the link is made between EBP switch and inventory switch. |
| Numberfinder | A measurement system to link vehicles with trains. |
